PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting the stone panels at the East Elevation 1.jpg Erecting the stone panels at the East Elevation 2.jpg Erecting the stone panels at the East Elevation 3.jpg Installing sprinkler branches-head at the 3rd floor Facing West.jpg Sprinkler heads at the 3rd floor Facing North.jpg
Previous page Sprinkler heads at the 3rd floor Facing North
Sprinkler heads at the 3rd floor Facing North